Commercial Completed

RMZ Millenia Park - OMR @ Chennai

Category : Commercial
Name of the Project : RMZ Millenia Park
Project Location : OMR @ Chennai
Name of the Client : RMZ Group
Name of the Architect : Innotech Engineering Consult Private Limited
Name of The PMC : Inhouse
Nature of Work : MS Staircaseand RCC Flooring in MLCP
Major Item of works : Flooring 12,000 Sqm & Structural steel 60 MT
Project Duration : 3 Months

Hiranandhani Park @ Thaiyur, OMR, Chennai

Category : Commercial
Name of the Project : Hiranandhani Park @ Thaiyur
Project Location : OMR @ Chennai
Name of the Client : Hiranandhani Group
Name of the Architect : Eskay Design
Name of The PMC : Inhous
Nature of Work : External Development and Boundry Wall
Major Item of works : Soil Filling, RR Masonary and Soild Block wall Compound wall
Project Duration : 3 Months

Amazon MAA-4 @ Valasaravakkam, Chennai

Category : Industrial
Name of the Project : Tata Blue scope Steel Pvt Ltd
Project Location : Oragadam, Chennai
Name of the Client : Tata Blue scope Steel Pvt Ltd
Name of the Architect : Aswthanarayana & Eswara
Name of The PMC : Aswthanarayana & Eswara
Nature of Work : Expansion of Header Bay – 50,000 sqft
Major Item of works : RCC and FM2 Flooring and Finishes
Project Duration : 3 Months

TPI Composite @ Aarush Logistics Park Oragadam @ Chennai

Category : Industrial
Name of the Project : TPI Composite @ Aarush Logistics Park
Project Location : Oragadam @ Chennai
Name of the Client : Ascendas Aarush
Name of the Architect : ARCH Project Consultants Pvt Ltd
Name of The PMC : Jones Lang Lasalle
Nature of Work : Internal Partions walls and Heavy duty MS Gratings
Major Item of works : 2500 Sqm of Block wall and 210 MT of Structural steel
Project Duration : 2 Months

AARUSH Logistics park Pvt Ltd Oragadam @ Chennai

Category : Industrial
Name of the Project : AARUSH Logistics park Pvt Ltd
Project Location : Oragadam @ Chennai
Name of the Client : Ascendas Aarush
Name of the Architect : ARCH Project Consultants Pvt Ltd
Name of The PMC : Jones Lang Lasalle
Nature of Work : Trim booth, Waste Storage, Hazardus Storage – 45,000 Sqft
Major Item of works : 600mm Dia Piling, Footing, RCc Pedestal and GSB and FM2 Flooring and Block wall Height of 7M
Project Duration : 2 Months

AARUSH Logistics park Pvt Ltd Oragadam @ Chennai

Category : Industrial
Name of the Project : AARUSH Logistics park Pvt Ltd
Project Location : Oragadam @ Chennai
Name of the Client : Ascendas Aarush
Name of the Architect : ARCH Project Consultants Pvt Ltd
Name of The PMC : Jones Lang Lasalle
Nature of Work : RE Wall, RR Masonary Drain & Cutting & Filling
Major Item of works : RCC 2000 Cum, RR Masonary 3000 Cum, Cutting and Filling of Earth 50,000 Cum
Project Duration : 3 Months

AARUSH Logistics park Pvt Ltd Oragadam @ Chennai

Category : Industrial
Name of the Project : AARUSH Logistics park Pvt Ltd
Project Location : Oragadam @ Chennai
Name of the Client : Ascendas Aarush
Name of the Architect : PTK Architects
Name of The PMC : CBRE South Asia Pvt Ltd
Nature of Work : External Raod, Drain, Compund wall & Marketing Office
Major Item of works : RCC 5000Cum, Block work 5000Sqm & Buildings
Project Duration : 3.5 Months

AARUSH Logistics park Pvt Ltd Oragadam @ Chennai

Category : Industrial
Name of the Project : AARUSH Logistics park Pvt Ltd
Project Location : Oragadam @ Chennai
Name of the Client : AARUSH Logistics park
Name of the Architect : ARCH Project Consultants Pvt Ltd
Name of The PMC : Jones Lang Lasalle
Nature of Work : Spine BT Road, RCC Drain, Stone Pitching, RCC Culvert,etc
Major Item of works : RCC 4000 Cum, GSB 5,000, BT 20,000Sqm, Hill earth 8000 Cum, Stone Pitching 6000 Sqm
Project Duration : 4 Months

P N Writer - 7 Panapakkam @ Chennai

Category : Industrial & Ware house
Name of the Project : P N Writer – 7
Project Location : Panapakkam @ Chennai
Name of the Client : Vinplex India Pvt Ltd
Name of the Architect : C R Narayana Rao Architects
Name of The PMC : Inhouse
Nature of Work : Major Item of works : RCC 5000Cum, Soil Filling – 25,000Cum & FM2 Flooring – 80,000 Sqft
Project Duration : 4.5 Months